East Gloria Switch Road will see intermittent closures from Beau Bassin Road to Sawmill Highway through Dec. 2 as crews rebuild the base and add an asphalt overlay.
A $14 million DOTD project on Ambassador Caffery Parkway in Lafayette began October 26 with nightly lane closures from 8 p.m. to 6 a.m. through fall 2027.
LCG closes the southeast-bound lane of Marie Antoinette Street from Pandora to Congress in Lafayette September 15–18. A new traffic signal and sidewalks are being installed.
A $1.43 million DOTD road improvement project on LA 92-1 in St. Martin Parish begins August 17 and runs through October. Expect intermittent lane closures Monday through Friday.
LCG is closing Becky Lane between Kaliste Saloom and Drury Lane from August 17 through September 30 for drainage and erosion control work in the coulee.
The LA 14 Bypass Bridge over the Vermilion River in Abbeville closes 8 p.m. Wednesday, July 29 through 3 a.m. Thursday, July 30 for DOTD bridge deck repairs.
Gourmet Road at Prejean Road in Carencro will be closed July 20 through August 3 for drainage work. Detours include Desoto Road, W. Gloria Switch Road, and N. University Avenue.